The preparation work before the construction of blast furnace refractory materials is an optimization decision made on the resource supply of the proposed project objectives, the selection of construction plans, spatial layout, and time arrangement, etc. It is to establish necessary technical and material conditions for the construction of the proposed project, and to coordinate and arrange the construction force and construction site. Therefore, blast furnace refractory material manufacturers believe that doing a good job in construction preparation is of great significance for leveraging enterprise advantages, resource allocation, accelerating construction progress, improving engineering quality, reducing engineering costs, achieving economic benefits for wall reinforcement enterprises, winning corporate social trust, and achieving modernization of enterprise management.
The construction preparation for the blast furnace construction project generally includes technical preparation, resource preparation, internal and external preparation of the construction site, and related platform coordination work
Technical preparation is the core of construction preparation, mainly including
a) Familiarize and review (self review and joint review) construction drawings (drawings and related design materials of this profession and other professions related to this profession), and try to solve any incomplete, unclear or incorrect problems in the construction drawings or design materials as much as possible before construction
(2) Calculate the engineering quantity, mechanical design quantity, and prepare the engineering material plan (mainly the refractory material plan). The transportation and construction losses in the engineering refractory material plan should be comprehensively considered based on factors such as material, quantity, variety, packaging method and transportation method, as well as the construction capacity and experience of the unit
(3) Preparation of construction organization design (Construction plan, construction organization design is a comprehensive document used to guide the technical, economic, and organizational aspects of various activities during the construction process. It is the basis for organizing construction, and its main content includes: engineering overview and construction characteristics analysis, refractory material transportation and construction layout, main construction plan and methods, construction progress plan, labor plan, and material, machinery, and equipment plan to ensure quality, safety, environmental protection, and environmental protection.) Technical and organizational measures for low-cost and rainy season construction
Blast furnace refractory material manufacturers believe that resource preparation is an important part of construction preparation and a necessary condition for preparing construction organization design. Its main content includes resource preparation for rain and fire materials, machinery and tools, as well as human resource preparation for construction project management agencies and labor organizations
The preparation inside and outside the construction site and the coordination of relevant platforms are necessary to create favorable construction conditions and provide necessary support for the construction. The main contents include:
Do a good job in the "three connections and one leveling" of the site, plan the site layout and temporary facilities, install and debug special facilities and construction machinery, provide temporary maintenance sites for refractory materials on site, implement construction measures during winter rainy season, implement backup measures such as construction safety, environmental protection, and fire security, and sign supply contracts for engineering materials and construction materials (including co rotating materials) to ensure timely supply of qualified products, Coordinate and cooperate with relevant disciplines and handle process handover procedures
The manufacturer of blast furnace refractory materials believes that the preparation for the construction of blast furnace construction projects should be based on the requirements of Taiwan and the commitments made to the construction unit. The construction unit's own resources and resources, the conditions of the construction site, the size and characteristics of the project, and many other factors should be taken into account. In accordance with the principle of "meeting the construction, serving the owner, advanced management, and economic use", the preparation work for the construction of blast furnace construction projects should be carefully and orderly carried out.
The above are some pre construction preparations for blast furnace refractory materials shared by the manufacturers today, hoping to help everyone.